Internal Refit and Enabling Works for Gice Colins Long
Client: Grice Colins Long
Location: Dorchester
Job Type: Internal Refit and Enabling Works for new Tenant
Role: Main Contractor
Value: £33,731.27
Date: 17/04/23 – 24/05/23
Case Study: FM Serv’s South Street, Dorchester Renovation Project
Project Overview: FM Serv, a leading facilities management and construction company, successfully completed a comprehensive renovation project at South Street, Dorchester. The project involved various construction and renovation tasks to transform an existing building into a modern, functional, and aesthetically pleasing space. This case study outlines the scope of work, challenges faced, and the successful outcomes achieved by FM Serv.
Scope of Works: FM Serv’s project at South Street, Dorchester included the following specifications of work:
- Temporary Hoarding Installation:
- FM Serv installed temporary hoarding on the exterior of the building to ensure safety and security during the construction process.
- First Floor Support:
- Acro props were employed to provide support to the first floor while cutting the slab, ensuring structural stability.
- Slab Cutting and Preparation:
- The existing slab was cut to dimensions of 5100 x 1100 to accommodate the new layout.
- The slab was prepared for the installation of a new ring beam.
- Ring Beam Installation:
- A new concrete ring beam measuring 5100 x 1100 was poured to reinforce the structural integrity of the building.
- Ground Floor Walls and Entrance:
- FM Serv constructed ground floor supporting walls and a new entrance, enhancing the building’s accessibility and aesthetics.
- Front Door and Window Replacement:
- A sleek black gloss front door was installed, adding a modern touch.
- A new front window, matching the existing specifications, was also installed.
- Paving:
- New paving was laid to match the street, creating an inviting exterior.
- Ground Floor Matting:
- The entire ground floor area was filled with Coir coconut matting, 23mm thick, providing a durable and sustainable flooring solution.
- Staircase Preparation and Installation:
- The area for the staircase was prepared for installation.
- A new staircase, designed as per the drawings, was installed.
- Fire-Rated Ceiling:
- Two layers of 15mm Gyproc Soundbloc plasterboard were installed beneath the staircase soffit to achieve a 1-hour fire rating, enhancing safety.
- First Floor Doors:
- Two new doors were installed on the first floor, improving room functionality and security.
Services: In addition to the construction work, FM Serv provided comprehensive services, including:
- Lighting Installation:
- Five new lights were installed in communal areas, enhancing visibility and safety.
- A push switch with a timer was added for energy efficiency.
- Flooring Integration:
- FM Serv integrated the flooring on the ground floor to connect with the Soil Vent Pipe (SVP), ensuring proper drainage.
Challenges and Solutions: Throughout the project, FM Serv encountered several challenges, including working within a limited space and adhering to a tight schedule. To overcome these challenges, the team implemented meticulous planning, efficient coordination, and skilled labour.
Successful Outcomes: FM Serv successfully delivered the South Street, Dorchester project on time and within budget. The renovated building now boasts enhanced structural integrity, improved aesthetics, and increased functionality. The project has garnered positive feedback from the client and serves as a testament to FM Serv’s commitment to delivering high-quality construction and facilities management services.
FM Serv remains dedicated to its mission of transforming spaces and exceeding client expectations through its expertise and innovation in the construction and facilities management industry.
Contact us now if you think we could be of service to you.





Thanks to my father who informed me on the topic of